METALLBAU:

Vergleichspreise 2014 für Rümpfe und Ausbau- alles in EURO:

=> 26.02.2017: KEINE Preissteigerung gemeldet!

bieten Entscheidungshilfe bei der Auswahl des HD- Partners als sehr rationellem Profi- Helfer:

Price comparison 2014 for hulls and completion work

=> 26.02.2017: no price increase reported

helps to decide about the best possible professional assistance for you:

  1. Metallbau/ metall work
  2. Ausbau/ completion work

HD- Profihelfer- Adressen/ Adresses for HD- partners for professional assistance

finden Sie hier/ please find here

NEU:

|HIER finden Sie nun auch alle HD- Partner für Rigg, Segel, Ausrüstung und Versicherung
 

Aluminiumbau/ aluminium work

HD- Metallbau- Helfer/

HD- partner:

Rehberger :

Matzerath:

TARANGA

-

-

10M

30.500,-

31.200,-

EURO

36.000,-

37.000,-

11MS

41.900,-

42.350,-

S10

40.900,-

41.000,-

S11

43.500,-

44.200,-

12M

48.000,-

48.000,-

13M

51.500,-

52.000,-

15M

79.500,-

81.000,-

16M

86.000,-

87.000,-

TOURINA 115/120

OMEGA F

Fabian- Boote musste leider zum 1.1.2006 die Firma schließen. Die OMEGA gibt es daher jetzt nur noch als Holz- Selbstbauversion!

Fabian- Boats; grp-hull unfortunately no more available due to company closure

Definition der HD- System Profi- Hilfe:

Erklärungen zum Metallbau: ENGLISH: Definition about the metal construction:

Der LIEFERUMFANG VON METALLRÜMPFEN basiert technisch auf der Einhaltung der Baupläne und aller Anleitungen unserer Fachliteratur und ergänzender HD- Rundschreiben. Außen- Schweißnähte glattgeschliffen. Max Einbeulungen zwischen 2 Hauptspanten= Blechdicke in Stahl, halbe Blechdicke in Alu.

ALU- RÜMPFE: außen im Bereich von Spanten und Schotten plangeschliffen

In den Vergleichspreisen sind ENTHALTEN:

NICHT ENTHALTEN:

ACHTUNG: obige Kosten sind nur zu Vergleichszwecken aufgeführt und beinhalten KEINE CE- HERSTELLERBESCHEINIGUNG, die für komplette Ausbaurümpfe erforderlich wäre. Diese wird für die anschließende Fertigstellung im Selbstbau jedoch nicht mehr benötigt und kann- nach Begleichung der nicht unerheblichen Kosten- weggeworfen werden. (siehe auch: HD- System => CE- Kennzeichnung).

SELBST- AUSBAUER bestellen daher KEINEN kompletten Ausbaurumpf, sondern klar definierte Einzelleistungen wie Baumaterial, Hallenmiete, Zuschnitte, Schweißarbeiten, Ausbauplatz usw.

Wer einen Rumpf NICHT IM EIGENBAU fertigstellen läßt, bestellt einen kompletten Ausbaurumpf mit CE- Herstellerbescheinigung und rechnet die CE- Herstellerbescheinigungskosten zu obigen Preisen dazu (=> Buch "YACHTBAU", 5. Auflage, Kap. C.1.3).

Alle obigen Alupreise basieren auf einem durchschnittlichen Alu- Preis von Dezember 2006. Bei steigenden Preisen (ist derzeit leider aktueller Trend) können obige Kosten im entsprechenden Verhältnis angepaßt werden.

Alle obigen Preise für Aluausführung

Stahlausführung NICHT MEHR SINNVOLL und von unseren Profihelfern NICHT mehr lieferbar: Aufgrund rasant steigender Stahlpreise kaum noch Kostenvorteil für Stahl.

Allgemeine Erklärungen:

Alle Eigenleistungen sind von den Vergleichspreisen abzuziehen.

MEHR ARBEITEN- ODER MEHR ZAHLEN- IHRE ALTERNATIVE!

Alle Preise sind in EURO inkl. 19% NEUE deutscher MwSt.

Alle Preise nach Angaben der Hersteller, ohne Gewähr

=================================

ENGLISH: Definition about the metal construction:

The scope of supply of metal hulls is technically based on the compliance with the building plans and all instructions of our technical literature and supplementary HD- circular letters. Outer welding seams plain grinded. Max. dents between 2 main frames=hull thickness in steel, half hull thickness in aluminium.

ALUMINUM HULLS: plain grinded on the outside in the area of frames and bulkheads

STEEL HULLS: Sand-blasted SA 2,5 and 2 component primer

Following is included in the comparison prices:

- centre keel (small surcharge for ASY- Twin- keels/ included at 10M, 11MS and EURO)
- rudder c/w POM- rudder bearings (tiller and quadrant exclusive)
- integrated tanks with covers and sealing (screwed and pressure- tested)
- engine foundations (measures to be acc. actual engine)
- stern tube with rubber bearings in phenol plastic tube
- rubbing pieces, accurately welded to hull
- mast support stanchion, c/w top plate suitable for actual mast foot
- chain plates and forestay fittings/ bow platform and transom niche
- metal hatches and bulkhead doors c/w covers and hinges

NOT INCLUDED:

- lead filling of keels since some clients want to deliver their collected lead scrap metal (no longer useful! -for approx. EUR 2.00/kg the metal builder delivers and casts the lead)

- deck fittings like railing, clamps, winch foundations etc. are defined as Extras

CAUTION: the above costs are listed for comparison purposes only and DON'T contain a CE MANUFACTURER CERTIFICATE which would be required for complete delivered hulls. This isn't needed any more for the following self- completion and could be thrown away after having paid the significant costs for it.

Self builders therefore don’t order a complete hull but clearly defined single orders for building material, hall rent, cutting, welding work, outfitting area etc.

Who does NOT finish boat himself as self- built- yacht, orders a complete hull with CE manufacturer certificate and adds the CE manufacturer certificate costs to the above prices Book >YACHTBAU<, 5th edition, chapt. C.1.3.)

All above aluminium prices are based on the average aluminium price of Decembre 2006. The above costs might be adjusted accordingly at increasing aluminium prices.

All above prices for aluminium execution.

Steel execution makes no more sense due to high raised steel prices. No more available from HD- Partners

General explanations:

All own work are to be deleted from the comparison prices.

PAY LESS OR WORK LESS ACCORDING TO YOUR OWN CHOICE.

All prices are in EURO, incl. 19% NEW German VAT, according to information from the manufacturers liability-free!

top... | zurück...I home
 

Ausbau/ completion work

Achtung: Preise nicht aktuell, Stand von 2009!

HD- Ausbau- Helfer/ HD- partner:

Matzerath

Matzerath

Matzerath

Ausbaustandard/

furniture standard

E= Euro: recht leicht, glattflächig- elegant, preiswert

E=Euro: lighgtweight, smooth surfaces, lowest price

E+= wie E, jedoch Zierleisten- Verschönerung u.a. (die gute Mitte)

E+= like E, but with add. wooden aplication etc. (good average)

C= Classic: sehr solide, viele massive Rundungen, aufwendiger, teurer,

C= Classic: very solid, massive wooden corners, high and more expensive standard

10M

34.700,- 40.400,- 50.500,-

EURO

39.200,- 45.100,- 56.300,-

11MS

41.000,- 42.000,- 55.700,-

S10

38.600,- 46.200,- 53.400,-

S11

45.100,- 52.690,- 67.700,-

12M

50.380,- 58.740,- 79.400,-

13M

55.800,- 64.000,- 81.200,-

15M

16M

TOURINA 115/120

Erklärungen zur HD- Ausbauhilfe: ENGLISH: Definitions for HD- interior work:

Obige Ausbau- Preise beinhalten fachgerechte, oberflächenbehandelte Tischlerarbeiten inkl. Einbau der Eigner- gelieferten Komponenten wie Waschbecken, WC- Becken, Kocher, Lampen usw.

Nicht enthalten ist die Installation obiger Komponenten, E- Anlagen mit Kabelbahn, sanitäre Installation und Leitungen- separat anfragen (ACHTUNG: Die Verlegung von Elektro-, Rohr- und Schlauchleitungen sollte unbedingt PARALLEL zum Ausbau erfolgen! )

Bei E- Anlagen ist Profi- Hilfe sinnvoll. Sonstige Installationen, Fenster, Decksluken, Matratzen, Polster usw. sind meist sinnvollerweise Eignerlieferung.

Einrichtungsstandard und Umfang sind naturgemäß sehr schwer zu definieren. Deshalb sind obige PREISE ALS ANHALT zu verstehen. Ein detailliertes Gespräch mit den Ausbauern zur Festlegung des genauen Umfangs und Standards, am Besten anhand von Fotos, ist unumgänglich.

================

ENGLISH: Definitions for HD- interior work:

The above interior work prices contain professional, surface treated joiner work and mounting of the owner delivered components like washbasin, toilet basin, cooker, lights etc.

NOT included is the INSTALLATION of above equipment, electric plants with cable ducts, sanitary installation and lines- ask for separate quote (CAUTION: installation of cables, pipes and hoses should be done parallel to the interior work.

For electric installation professional help is recommended.

Other equipment like windows, upholsteries, hatches, cushions are recommended to be owner’s supply.

Interior work standard and extent are naturally very hard to define.

The above prices have therefore to be understood as a sample.

A detailed conversation with the supplier is indispensable to specify the exact extent and standards, best with the help of photos showing comparable standards.

top... | zurück...... home
 

HD- Profihelfer- Adressen/

Adresses for HD- partners for professional assistance

Matzerath, Michael

M. Matzerath GmbH&Co KG

An der Garnbleiche 1-3

52349 Düren

Tel.: 02421 50 23 49

Fax: 02421 50 23 82

info@matzerath.de

www.Matzerath.de

Rehberger, Ulrich

Neuschmiede 1

D-83246 Unterwössen

Tel.: 08641 618 28

Fax: 08641 618 28

http://www.rehberger-yacht.de

NEU: info@rehberger-yacht.de